|
|
It takes approximately 1 1/2 to 3 hours per minute of song to create the sequence. Meaning, a 4 minute long takes between 6 to 12 hours to program. In Christmas 2007 there are over 9000 lights in the display, including
the static
The power usage for the 2007 display cost approximately $90. Much less what one would think. But, since not all the lights are not all on at the same time, the actual power usages is much less. But, then entire display was engineering to have the ability to have everything all on at once. |
|
Siberian Sleigh Ride
|
Winter Wonderland
|
|
An Angle's Share
|
I'll Be Home For Christmas |
|
Christmas Eve-Sarajevo 12-24
|
Faeries [From The Nutcracker]
|
|
Send mail to
farandalights@gmail.com with
questions or comments about this web site.
|